PROJECT NAME: Rosebud Aquatic Centre
SECTOR: Sport & Recreation
BUILDER / CLIENT: Buxton Constructions
INSTALLATION CONTRACTORS: Cotter Floors Pty Ltd
INSTALLATION CONTRACTORS: JA Floors
MATERIALS:
- (VS1) Shaw Contract Group – Rethink “Minimal 0350” – 140m2
- (RS1) Regupol Everroll Core “Berlin” 8mm roll UN SEALED – 135m2
- (VS2) Gerflor – Mipolam Elegance EL5 “Grey 0352” – 13m2
- (RS2) Rephouse – Neoflex “600-012” 8mm SEALED – 192m2
- (RS3) Spectrum – Mondoflex 2 “MF70” 7.5mm rubber flooring – 275m2
- (RS4) Spectrum – Impact 10mm “S018 DARK GREY” 913.5mm X 913.5mm TILES – 400m2
- (CAR1) Ontera – Naturally Drawn, Drawing with ink “Antique Sand / Vintage Taupe” – 130m2
- (CAR2) Ontera – Water Yuludarla, Yildarn (Dreaming Track) “Ash” – 26m2
- (EM1) Birrus – Cocomat 10mm closed construction x 2
- (EM2) Birrus – Coco Brush “Natural” 11mm x 2
COMMENTS:
YAWA Aquatic centre located in Mornington Peninsulas – Rosebud is a state-of-the-art recreational centre offering a range of year-round aquatic, leisure and wellness facilities.
This 20 year anticipated “YAWA” aquatic centre construction is expected to attract 400,000 attendees yearly and give fantastic opportunities to community members – which we are thrilled to have been able to contribute.
The flooring package was competitively tendered and thankfully awarded to us by head contractor Buxton Constructions.
Our project scope was the procurement, management and installation of the local and internationally specified products as listed above.
This also encompassed floor preparation by way of diamond grinding, moisture suppressants, and cementitious levelling followed by the installation a wide variety of high-end speciality rubber, resilient / carpet finishes and entry matting.